We removed the concrete forms, and exposed the sides and the PVC tubes through the foundation. Then we re-measured and nailed in the baseplates for the basement wall SIPs to be installed onto, with 6 mil poly underneath.
![](//photos1.blogger.com/blogger/4500/3247/400/20060702_Base%20Plate_04.jpg)
Dylan, my godson, inspecting our work.
![](//photos1.blogger.com/blogger/4500/3247/400/20060702_Base%20Plate_08.jpg)
![](//photos1.blogger.com/blogger/4500/3247/400/20060702_Base%20Plate_11.jpg)
Dylan pulling some kung-fu moves.
![](//photos1.blogger.com/blogger/4500/3247/400/20060702_Base%20Plate_12.jpg)
One of the drainage tubes through the foundation
No comments:
Post a Comment